saskatoon - march 2021 to july 2021
We just finished an Inspection and Recommendations for Shell and Mechanical Retrofit to existing 50-year-old Aquatic Centre 50m pool. This includes replacement/repair of the existing tile pool shell, replacement on the pool fitting s and perimeter piping. Total upgrading of Pool Mechanical systems, filtration, water chemistry and levelling.
